Vetting inspection chechk list for chemical tanker (sample)



Ship’s Name                          :

Superintendent Name           :  
Item No

Check
Box
Last date
Last second date
1
Internal Audit report (within last 12 months) (non conformities to be closed out)


2
External audit report (non conformities to be closed out)


3
Last annual survey report


4
Cargo tank inspection dates (12 monthly) (after 5 year 6 monthly)


5
Ballast tank inspection dates (12 monthly) (after 5 year 6 monthly)


6
Void spaces, trunks and cofferdams inspection date (12 monthly) (after 5 year 6 monthly)



7
Last external drug and alcohol test onboard (12 monthly)

8
Last onboard alcohol testing (each month min %40 of the crew member and all crew including master to be tested)


9
NTM onboard


10
Ecdis update CD onboard


11
safety meeting reports dates (at least monthly)


12
accident/nearmiss report dates


13
fire and abondan ship drill dates


14
Launching of free fall dates (by free fall)


15
Lowering of free fall dates (by davit)



16
Emergency steering gear drill dates


17
Manoverboard drill dates


18

SMPEP drill dates and names



19

Emergency drills dates and names



20

QI drills (3 monthly but only for VRP vessels)



21

Launching of rescue boat to the water (at least monthly)



22

Ballast tank gas sampling unit sample points

(ex:ballast tanks  WBT1-2-3-4-5-6 P/S – PUMP ROOM)

 



23

Last calibration external date of ex-ox meters and their list/quantity





24

List of span gases and their expire dates




25

Life saving appliances weekly inspections



26

Life saving appliances last 2 monthly inspections



27

Lifeboat, rescue boat annual inspection by shore service



28

Last  foam compound test date



29

Last fire detector test dates (all detectors to be tested within 3 months)



30

ODME tests (monthly)



31

Quarterly Loading computer test dates ( 3 monthly)



32

Quantity of UTI 2 PCS



33

Quantity of closed sampling device 



34

Cargo lines test dates ( annually)



35

Last cargo hose test date



36

Number of mooring winches

Forward (single or double drum)   .4. pcs rope in the drum
Aft         (single or double drum)   .4. pcs rope in the drum

37

Last mooring winch brake test date

Winch brake holding capacity: 25.8T
MBL of the ropes                    :43.6T
Rendering point adjusted to    :%60T


38

GMDSS weekly test dates



39

GMDSS monthly test dates



40

GMDSS annual load test



41

Deadman alarm (engine room) alarm interval 15 minutes



42

Lifting appliances check dates (wire slings etc)



43

Last oil analysis report, and check alert status if any



44

Portable and fix pressure gauge onboard calıbratıon



45

Portable and fix thermometer onboard calıbratıon



46

Last bunker FO&DO analysıs onboard



47

Currently onboard cargo toxıc tube available onboard



48

Last gmdss training record in gmdss log book



49

Foam,fire,bw,ballast,heating line annually test with ısm no: and risk assessment



50

If applicable, ecdis drill



51

Isps Drill



52

Main Fire Pump



53

Emergency Fire Pump



54

Foam sea water pump test



55

FUEL/DO Quick Closing



56

Last emergency D/G



57

Main engine local start on engine side



58

Ows test



59

Last meger test carried as per ısm form NO:



60

Last cargo hoses and bw hoses meger test



61

Confirm well grassed and turned freely Deck Mooring Accessories Fairlead, roller Control date




 







Comments

T2